- Home
- Courses
- Trade School
- Land Surveying and Cost Estimation
Curriculum
- 12 Sections
- 106 Lessons
- 16 Weeks
Expand all sectionsCollapse all sections
- Module 01: Introduction to Land Surveying8
- Module 02: Land Surveying Basics7
- Module 03: Land Surveying Instrumentation8
- Module 04: Land Surveying Methods and Techniques10
- Module 05: Topographic Surveying and Mapping7
- Module 06: Boundary Surveying7
- Module 07: Cost Estimation22
- 7.1What Is an Estimate?
- 7.2Parametric Estimates
- 7.3The Main Types of Construction Cost Estimates
- 7.4Assembly Estimating
- 7.5Square-Foot Estimates
- 7.6Detailed Estimate
- 7.7Model Estimates
- 7.8Project Comparison Estimates
- 7.9Conceptual Estimates
- 7.10Preliminary Estimates and Cost Planning
- 7.11Preparing Construction Estimates
- 7.12Project Delivery Systems and Estimating
- 7.13Estimates for Different Types of Contracts
- 7.14Estimating Methods
- 7.15Single-rate approximate estimating
- 7.16Unit of accommodation method
- 7.17Floor area method
- 7.18Building volume method
- 7.19Multiple-rate approximate estimating
- 7.20Elemental cost plans
- 7.21Analytical estimating
- 7.22Operational estimating
- Module 08: Role of Cost Estimator and New Aspects of Cost Estimation4
- Module 09: Elements and Factors influencing Cost Estimation2
- Module 10: Cost Estimation in Construction Industry7
- 10.1What is project cost estimation?
- 10.2Cost Estimate of a Construction Project
- 10.3Estimation during the Project Report Stage and for Project Approval Execution Strategy
- 10.4Estimating for Planning Bill of Quantities
- 10.5Estimation for Variations
- 10.6Estimating for Planning and Scheduling
- 10.7What Makes a Good Cost Estimate?
- Module 11: Cost Management14
- 11.1Cost Types
- 11.2Additional Costs
- 11.3Detailed Cost
- 11.4Tendering Cost Estimate
- 11.5Cost Estimate to Project Control
- 11.6Economic Analysis of Project Cost
- 11.7Organisation Breakdown Structure
- 11.8Work Breakdown Structure
- 11.9Work Packages
- 11.10Cost Control
- 11.11Cash flow Calculation
- 11.12Cash Flow During the Project
- 11.13Impact on Increasing Cost
- 11.14Impact of Operation Efficiency
- Module 12: Surveying Health and Safety10
- 12.1Individual Responsibilities
- 12.2Personal Protective Equipment
- 12.3Construction Surveying Operations
- 12.4Surveying Near Traffic
- 12.5Surveying with Traffic Controls
- 12.6Surveying Without Traffic Controls
- 12.7First Aid
- 12.8Environmental Hazards
- 12.9Animal Hazards Precautions Concerning Snakes
- 12.10Plant Hazards
Land Surveyor Vs. Building Surveyor vs. Quantity Surveyor
Next


